Signed in as:
filler@godaddy.com
Signed in as:
filler@godaddy.com
YH Provider Consulting is a licensee of the Get PumpingTM Application, a mobile software application executable on iOS and Android mobile operating systems.
The software application is offered to assist with the installation of rods (steel sucker rods and/or fiber glass), for oil and natural gas wells.
The rod spacing calculator and pony rod selection tool provides a guideline for effective use of rig time. Get PumpingTM App will provide you as an operator or technical installation field professional with a unique simplification of your calculation procedures.
It will also help you and your team to validate your process prior to installing the rod string.
The steel rod spacing calculation is
based on recommendations from steel
rod manufacturers on how to set
spacing. This measurement is created
to allow for the fluctuation in overall
length of the rod string during the
pumping cycle. Pump spacing with
steel sucker rods normally requires
only one to two feet of clearance
between the plunger and the standing
valve or the bottom of the pump.
The fiberglass rod spacing calculation
has been created by the fiberglass
manufacturers to help the operator to
consider the dynamic changes that
occurs in the rod string when using
fiberglass. Spacing is critical to ensure
the proper use of the downhole pump,
but also to protect your rod string.
The calculation provides the
maximum spacing needed to protect
the rod string and the pump as the
well pumps down. This spacing may
not be optimal for every application.
There are many variables that can
affect the actual pump spacing
needed, such as fluid level, gas
interference, pumping speed,
deviation, etc. which will affect the
effectiveness of the recommended
spacing.
As a "field development" integrated
consulting firm at "YH Provider
Consulting" as the licensee of the Get
Pumping"' we promote and provide
training to the APP Software Subscribers
because we realize how critical spacing
and installation process are to produce a
well at optimal conditions.
Get PumpingTM is an open source type of software using Net Framework
ENSURING A SAFE WORK PLACE REQUIRES EVERYONE’S COMMITMENT.
ALL PERSONNEL INVOLVED AT THE WELL SITE SHOULD STOP ANY UNSAFE WORK OR WHEN THEY DETECT A POTENTIAL HAZARD.
IF HAZARDOUS CONDITIONS ARE PRESENT PLEASE INFORM YOUR SUPERVISOR LEVEL PERSONNEL OR COMPANY MAN
Are your customers raving about you on social media? Share their great stories to help turn potential customers into loyal ones.
At well site arrival, observe the following best practices:
• Review the running procedure of the rod string.
• Inspect Rod string components and validate quantity, size, length, type or grade, pin size, guide size.
• Examine sucker rods to assure no damage was caused during transportation to well site.
• Inspect elevators and rod wrenches (right size/good conditions).
• Use proper displacement card(s).
• Check service rig to be correctly positioned over the wellbore.
• Make sure threads are lubricated before makeup.
• Ensure proper make up.
• Check torque periodically.
Copyright © 2020 YH PROVIDER - All Rights Reserved.
This website uses cookies. By continuing to use this site, you accept our use of cookies.